Disruption cause: noodzakelijke aanpassing in de dienstregeling
This page shows more information about this disruption cause.
This disruption cause has been categorized under .
Recent service disruptions
Recent disruptions which are caused door noodzakelijke aanpassing in de dienstregeling. The three most recent service disruptions are shown.
View all disruptions caused door noodzakelijke aanpassing in de dienstregeling.
Most affected lines
List of the railway lines which are most often affected by this cause.
-
Breda - Tilburg
2 disruptions • duration: 2 days, 6 hours -
Winterswijk - Zutphen
1 disruption • duration: 7 hours, 1 minute -
Leiden Centraal - Schiphol Airport
1 disruption • duration: 7 minutes -
Amsterdam Centraal - Schiphol Airport
1 disruption • duration: 5 minutes -
Rotterdam Centraal - Schiphol Airport
1 disruption • duration: 5 minutes
* One disruption often impacts multiple railway lines. In those cases, the same disruption is counted for each affected line.
Statistics
Statistics for this cause are calculated over the past 24 months.
The average duration for this cause is 12 hours, 12 minutes.
Number of disruptions and total duration
This graphs shows the number of disruptions which are caused door noodzakelijke aanpassing in de dienstregeling and the total duration of these disruptions (measured in hours).
Disruptions per weekday
This graphs shows the number of disruptions per day of the week.