Engineering works: Hengelo - Bielefeld
Situation
Between Rheine and Osnabrück Hbf buses are running due to engineering works.
The extra travel time is about 60 minutes.
Period
Between Thursday, September 26, 2024 12:00 PM hours and Monday, October 7, 2024 1:00 AM hours.
Advice
Tussen Rheine en Ibbenbüren rijden bussen. (ma 30 sept tussen 19.45 en 24.00 u ook vanaf Hengelo) (za 5 en zo 6 okt tussen Rheine en Osnabrück Hbf).
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Stoptrein 20350 to 20397 Bad Bentheim/Bielefeld Hbf - Bielefeld Hbf/Bad Bentheim runs less often between Hengelo and Bad Bentheim
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Thursday, September 26, 2024 12:00 PM and Monday, October 7, 2024 1:00 AM.