beperkingen materieel

Problems with the rolling stock: Venlo-Mönchengladbach-Düsseldorf (10 April 2022)

  1. Disruption resolved Last update

    Between Venlo and Mönchengladbach Hbf the train traffic is fully resumed.

  2. Show complete timeline…
  3. Disruption reported

    Between Venlo and Mönchengladbach Hbf is er later vandaag hinder in de treindienst due to problems with the rolling stock.
    This will take until approximately 10:15 PM hours.

    Advice

    Vanaf 16:00 tot 22:15 rijden er door beperkingen in de materieelinzet minder treinen tussen Venlo en Mönchengladbach.

Location of this disruption

This disruption is between Venlo and Mönchengladbach Hbf.

Map of the location of this disruption

See the disruptions map for a live overview of all disruptions in the Netherlands.

More about this disruption

Statistics

This disruption started at 1:16 PM on April 10, 2022 and took 8 hours, 56 minutes in total.

For statistics, this disruption is caused due to problems with the rolling stock.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by eurobahn.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights